احداث مسیر جایگزین و سازه محافظ ترانشه ریزشی

Construction of an alternative route and a protective structure for the collapse trench

  • Employer: National Roads Construction and Development Company
    Consultant: Ittefat Tarh and Tadbir
    Contractor: Sakht Beton Bandar
    Construction of a gallery: 500 meters long
    Excavation: 20,000 cubic meters
    Earth placement: 8,150 cubic meters
    Backfilling of the wall with soil: 6,000 cubic meters
    Reinforcement: 707,537.62 kg
    Formwork: 8,512.68 square meters
    Concreting: 6,464.11 cubic meters
    Drainage: 18,642.2 cubic meters
    Foundation: 2,484 cubic meters
    Sub-foundation: 5,500 cubic meters
    Asphalt: 4,674.432 tons

Project for construction of alternative route and collapse trench protection structure

Employer:
National Roads Construction and Development Company
Consultant:
Coincidence of planning and strategy

Follow us

Our extensive resume consists of over 3,500 completed projects.

Our diverse project list includes earthworks, foundation works, tunnel excavations, and more.

ادامه مطلب
احداث شبکه هدایت سیلاب قسمت شرقی و میانی 3

Construction of flood control network in the eastern and central parts

  • Client: Persian Gulf Mines and Mineral Industries Development and Renovation Organization
    Consultant: Rahyab Melal
    Contractor: Sarrig Bandar
    Excavation: 510,429 cubic meters
    Canal digging: 147,607 cubic meters
    Drainage: 153,644 tons
    Formwork: 272,252 square meters
    Concreting: 178,060 cubic meters

Flood control network construction project in the eastern and central parts

Employer:
Persian Gulf Mines and Mineral Industries Development and Renovation Organization
Consultant:
The Wayfinder of Nations

Follow us

Our extensive resume consists of over 3,500 completed projects.

Our diverse project list includes earthworks, foundation works, tunnel excavations, and more.

ادامه مطلب
اجرای تقاطع غیرهمسطح خلیج فارس

Implementation of the Persian Gulf Unlevel Intersection

  • Client: Bandar Abbas Municipality
    Consultant: Pars Test Route
    Number of non-level intersections: 2 units
    Pile drilling and execution: 1344 meters long
    Reinforcement: 951.716 kg
    Concreting: 21059.24 cubic meters
    Formwork: 22419.44 square meters
    Press table: 11667 pieces
    Subbase: 6.500 cubic meters
    Base: 3.200 cubic meters
    Asphalt: 5273 tons

Persian Gulf Unlevel Intersection Implementation Project

Employer:
Bandar Abbas Municipality
Consultant:
Pars Test Route

Follow us

Our extensive resume consists of over 3,500 completed projects.

Our diverse project list includes earthworks, foundation works, tunnel excavations, and more.