• Employer: National Roads Construction and Development Company
    Consultant: Ittefat Tarh and Tadbir
    Contractor: Sakht Beton Bandar
    Construction of a gallery: 500 meters long
    Excavation: 20,000 cubic meters
    Earth placement: 8,150 cubic meters
    Backfilling of the wall with soil: 6,000 cubic meters
    Reinforcement: 707,537.62 kg
    Formwork: 8,512.68 square meters
    Concreting: 6,464.11 cubic meters
    Drainage: 18,642.2 cubic meters
    Foundation: 2,484 cubic meters
    Sub-foundation: 5,500 cubic meters
    Asphalt: 4,674.432 tons

Project for construction of alternative route and collapse trench protection structure

Employer:
National Roads Construction and Development Company
Consultant:
Coincidence of planning and strategy

Follow us

Our extensive resume consists of over 3,500 completed projects.

Our diverse project list includes earthworks, foundation works, tunnel excavations, and more.

در دریافت آخرین پیشنهادات انحصاری ، انتشارات محصول و خیلی بیشتر مطمئن باشید

در خبرنامه ما ثبت نام کرده و مشترک شوید و هر ماه تخفیف بگیرید