Our extensive resume consists of over 3,500 completed projects.

- Client: Hormozgan Province Road and Urban Development Department
Consultant: Iran Sahel Consulting Engineers
Road Length: 6-Span River Bridge, 20 Meters, 20321 Main Road Connections
Earthworks: 191,680 cubic meters
Concrete Pouring: 11,005 cubic meters
Pile Driving: 16.20 meters
Foundation and Sub-Foundation: 14,200 cubic meters
Asphalt: 8,746 tons
Temporary connection implementation project for the construction of a special bridge and wall construction, extending the Persian Gulf Highway to Shahid Rajaee Freeway
Employer:
Hormozgan Province Road and Urban Development Department
Consultant:
Iran Sahel Consulting Engineers
Related projects

Preparation of 78 hectares of land for the 4,000-unit Melvanan complex
نوآوری فناوری و محصول توسط بایرون فردا در شش قاره سبزتر است

45-meter Pardis Boulevard and the Khur Shilat Intersection Bridge
نوآوری فناوری و محصول توسط بایرون فردا در شش قاره سبزتر است

Prophet Muhammad Highway in the north of Bandar Abbas city
نوآوری فناوری و محصول توسط بایرون فردا در شش قاره سبزتر است

Bandar Abbas Coastal Boulevard
نوآوری فناوری و محصول توسط بایرون فردا در شش قاره سبزتر است

Preparing 150 hectares of land in Bandar Abbas
نوآوری فناوری و محصول توسط بایرون فردا در شش قاره سبزتر است

Wall and road construction around Hormozgan University