Construction of an alternative route and a protective structure for the collapse trench

Construction of flood control network in the eastern and central parts

Implementation of the Persian Gulf Unlevel Intersection

Preparation of 78 hectares of land for the 4,000-unit Melvanan complex

45-meter Pardis Boulevard and the Khur Shilat Intersection Bridge

Construction of a road and perimeter wall for the development site of the Persian Gulf Special Economic Zone for Mining and Metal Industries

Prophet Muhammad Highway in the north of Bandar Abbas city

Bandar Abbas Coastal Boulevard

Completion of the improvement of the Sacred Defense – Shahid Namjoo intersection and the non-level intersection

Preparing 150 hectares of land in Bandar Abbas

Wall and road construction around Hormozgan University

Construction of access road to crude oil storage tanks in Jask Port and carrying out tank pre-loading operations and tank bed consolidation

Parts 2/A, -3/B, -4/A, additional 4/B, 5 and 3/5 of the second lane of the Bandar Abbas-Sirjan highway

Earthworks for fencing and construction of access roads to Hormuz Oil Refinery and Setareh Persian Gulf Refinery

Participation in the operation to prepare the infrastructure services of the 74-hectare Radzi project west of Qeshm city

Construction of the second runway Minab – Jask, distance 000+142 to 000+167

Completion of the improvement of the Holy Defense-Namjo intersection and connection to Hormord

Implementation of temporary connection of special bridge and wall construction, extension of Persian Gulf Highway to Shahid Rajaee Freeway
Completion of concrete blocks and skeleton of the Science and Technology Park

Bandar Abbas International Airport Pavilion

Completion of Kohstak Entrance Boulevard

Road construction operations on the Sirik-Mishi axis

Construction of internal and external road access routes to the Sirik Port Pier

Hormuz Oil Refinery Construction Plan

Bandar Abbas Gas Condensate Refinery Construction Plan

Improvement and widening of Jask – Minab axis, plot 4

Phase 1 of the Khamir Multipurpose Port Implementation Operation

Completion of the second runway of the Minab-Minab three-way

Leveling and stabilizing 78 hectares of land in Bandar Abbas city

Completion of asphalt coating of the 5-axle section of Jask – Minab

Completion and preparation of the 80-hectare plan for Prophet Azam Town and 1-45 Boulevard

Improvement of the Sacred Defense Square – Shahid Namjoo axis

Construction and invasion of the Khajeh Atta coastal strip

Construction of the main building street and the area surrounding the University of Medical Sciences

Construction of roads for the Hormozgan Province Industrial Estates Development Plan

آماده سازی اراضی 78 هکتاری مجتمع 4000واحدی ملوانان

بلوار 45 متری پردیس و پل تقاطع خور شیلات

احداث جاده و دیوار پیرامونی سایت توسعه منطقه ویژه اقتصادی صنایع معدنی و فلزی خلیج فارس

بزرگراه پیامبر اعظم در شمال شهر بندرعباس

بلوار ساحلی بندرعباس

تکمیل بهسازی تقاطع دفاع مقدس – شهید نامجو و تقاطع غیر همسطح

آماده سازی اراضی 150 هکتاری بندرعباس

دیوارکشی و جاده پیرامونی دانشگاه هرمزگان

احداث جاده دسترسی به مخازن ذخیره سازی نفت خام در بندر جاسک و انجام عملیات پیش بارگذاری مخازن و تحکیم بستر مخازن

قطعات 2/الف، -3/ب، -4/الف، تکمیلی 4/ب، 5و3/5 باند دوم بزرگراه بندرعباس – سیرجان

مشارکت در عملیات آماده سازی خدمات زیربنایی راضی 74 هکتاری غرب شهر قشم

احداث باند دوم میناب – جاسک حدفاصل 000+142 تا 000+167

تکمیل بهسازی تقاطع دفاع مقدس – نامجو و اتصال به هورمورد

عملیات اجرایی اتصال موقت احداث پل خاص و دیوارسازی ادامه بزرگراه خلیج فارس به آزادراه شهید رجایی

تکمیل بلوار ورودی کوهستک