• Client: Bandar Abbas Municipality
    Consultant: Pars Test Route
    Number of non-level intersections: 2 units
    Pile drilling and execution: 1344 meters long
    Reinforcement: 951.716 kg
    Concreting: 21059.24 cubic meters
    Formwork: 22419.44 square meters
    Press table: 11667 pieces
    Subbase: 6.500 cubic meters
    Base: 3.200 cubic meters
    Asphalt: 5273 tons