احداث مسیر جایگزین و سازه محافظ ترانشه ریزشی

Construction of an alternative route and a protective structure for the collapse trench

  • Employer: National Roads Construction and Development Company
    Consultant: Ittefat Tarh and Tadbir
    Contractor: Sakht Beton Bandar
    Construction of a gallery: 500 meters long
    Excavation: 20,000 cubic meters
    Earth placement: 8,150 cubic meters
    Backfilling of the wall with soil: 6,000 cubic meters
    Reinforcement: 707,537.62 kg
    Formwork: 8,512.68 square meters
    Concreting: 6,464.11 cubic meters
    Drainage: 18,642.2 cubic meters
    Foundation: 2,484 cubic meters
    Sub-foundation: 5,500 cubic meters
    Asphalt: 4,674.432 tons

Project for construction of alternative route and collapse trench protection structure

Employer:
National Roads Construction and Development Company
Consultant:
Coincidence of planning and strategy

Follow us

Our extensive resume consists of over 3,500 completed projects.

Our diverse project list includes earthworks, foundation works, tunnel excavations, and more.

ادامه مطلب
احداث شبکه هدایت سیلاب قسمت شرقی و میانی 3

Construction of flood control network in the eastern and central parts

  • Client: Persian Gulf Mines and Mineral Industries Development and Renovation Organization
    Consultant: Rahyab Melal
    Contractor: Sarrig Bandar
    Excavation: 510,429 cubic meters
    Canal digging: 147,607 cubic meters
    Drainage: 153,644 tons
    Formwork: 272,252 square meters
    Concreting: 178,060 cubic meters

Flood control network construction project in the eastern and central parts

Employer:
Persian Gulf Mines and Mineral Industries Development and Renovation Organization
Consultant:
The Wayfinder of Nations

Follow us

Our extensive resume consists of over 3,500 completed projects.

Our diverse project list includes earthworks, foundation works, tunnel excavations, and more.

ادامه مطلب
اجرای تقاطع غیرهمسطح خلیج فارس

Implementation of the Persian Gulf Unlevel Intersection

  • Client: Bandar Abbas Municipality
    Consultant: Pars Test Route
    Number of non-level intersections: 2 units
    Pile drilling and execution: 1344 meters long
    Reinforcement: 951.716 kg
    Concreting: 21059.24 cubic meters
    Formwork: 22419.44 square meters
    Press table: 11667 pieces
    Subbase: 6.500 cubic meters
    Base: 3.200 cubic meters
    Asphalt: 5273 tons

Persian Gulf Unlevel Intersection Implementation Project

Employer:
Bandar Abbas Municipality
Consultant:
Pars Test Route

Follow us

Our extensive resume consists of over 3,500 completed projects.

Our diverse project list includes earthworks, foundation works, tunnel excavations, and more.

ادامه مطلب
آماده سازی ارضی 78 هکتاری 3

Preparation of 78 hectares of land for the 4,000-unit Melvanan complex

  • Client: South Sea Sailors Housing Cooperative
    Consultant: Segal Consulting Engineers
Our extensive resume consists of over 3,500 completed projects.

Our diverse project list includes earthworks, foundation works, tunnel excavations, and more.

ادامه مطلب
بلوار پردیس

45-meter Pardis Boulevard and the Khur Shilat Intersection Bridge

  • کارفرما: شهرداری بندرعباس
  • دستگاه نظارت:مهندسین مشاور کرانه به کرانه
  • طول راه: 400+1 کیلومتر
  • عملیات خاکی:154،000 متر مکعب
  • بتن ریزی: 10،016 متر مکعب
  • اساس و زیر اساس: 31،000 متر مکعب
  • آسفالت: 7،753 تن

پروژه بلوار 45 متری پردیس و پل تقاطع خور شیلات

ما را دنبال کنید

رزومه گسترده ما متشکل از بیش از 3500 پروژه انجام شده است

لیست پروژه های متنوع ما شامل عملیات خاکی، اجرای لایه های اساسی، حفاری تونل و...... است

ادامه مطلب

Construction of a road and perimeter wall for the development site of the Persian Gulf Special Economic Zone for Mining and Metal Industries

  • Client: Iran Industries and Mines Development and Renovation Organization
    Consultant: Rahyab Melal Consulting Engineers
    Road Length: 42,000+km
    Prefabricated Wall: 42,000 sq m
    Earthworks: 3,618,880 cubic meters
    Concrete Pouring: 48,412 cubic meters
    Rolled Concrete: 61,043 cubic meters
    Foundation and Sub-Foundation: 38,401 cubic meters
    Asphalt: 31,019 tons

Road and perimeter wall construction project for the development site of the Persian Gulf Mining and Metal Industries Special Economic Zone

Employer:
Iran Industries and Mines Development and Renovation Organization
Consultant:
Rahyab Melal Consulting Engineers

Follow us

Our extensive resume consists of over 3,500 completed projects.

Our diverse project list includes earthworks, foundation works, tunnel excavations, and more.

ادامه مطلب
بلوار پیامبر اعظم

Prophet Muhammad Highway in the north of Bandar Abbas city

  • Client: Hormozgan Province Governorate
    Consultant: Iran Sahel Consulting Engineers
    Road Length: 6,000+km
    Earthworks: 665,000 cubic meters
    Concrete: 23,300 cubic meters
    Foundation and sub-foundation: 80,000 cubic meters
    Asphalt: 31,020 tons

The Great Prophet Highway Project in the north of Bandar Abbas city

Employer:
Hormozgan Province Governorate
Consultant:
Iran Sahel Consulting Engineers

Follow us

Our extensive resume consists of over 3,500 completed projects.

Our diverse project list includes earthworks, foundation works, tunnel excavations, and more.

ادامه مطلب
بلوار ساحلی بندرعباس

Bandar Abbas Coastal Boulevard

  • Client: Hormozgan Governorate
    Supervisory Agency: Harampe Consulting Engineers
    Road Length: 3,000+km
    Earthworks: 80,000 cubic meters
    Concrete: 250 cubic meters
    Foundation and sub-foundation: 20,000 cubic meters
    Asphalt: 5,000 tons

Bandar Abbas Coastal Boulevard Project

Employer:
Employer:
Consultant:
Pyramid Consulting Engineers

Follow us

Our extensive resume consists of over 3,500 completed projects.

Our diverse project list includes earthworks, foundation works, tunnel excavations, and more.

ادامه مطلب

Completion of the improvement of the Sacred Defense – Shahid Namjoo intersection and the non-level intersection

  • Client: Provincial Road and Urban Development Department
    Consultant: Bank to Bank
    Road Length: 5,000+km
    Earthworks: 181,000 cubic meters
    Concrete: 8,000 cubic meters
    Foundation and sub-foundation: 25,000 cubic meters
    Asphalt: 10,000 tons

Completion project for the improvement of the Holy Defense - Shahid Namjoo intersection and the non-level intersection

Employer:
Hormozgan Province Road and Urban Development Department
Consultant:
Karane be Karane

Follow us

Our extensive resume consists of over 3,500 completed projects.

Our diverse project list includes earthworks, foundation works, tunnel excavations, and more.

ادامه مطلب
عملیات خاکی

Preparing 150 hectares of land in Bandar Abbas

  • Client: Hormozgan Province Road and Urban Development Department
    Consultant: Hormoz Road Research
    Road Length: 150 hectares
    Earthworks: 3,500,000 cubic meters
    Concrete: 20,000 cubic meters
    Foundation and sub-foundation: 150,000 cubic meters
    Asphalt: 135,000 tons

150-hectare land preparation project in Bandar Abbas

Employer:
Hormozgan Province Road and Urban Development Department
Consultant:
Hormuz Rah Research

Follow us

Our extensive resume consists of over 3,500 completed projects.

Our diverse project list includes earthworks, foundation works, tunnel excavations, and more.

ادامه مطلب